Choose Language  :
            เลือกภาษา  :

Main Menu

เมนูหลัก

Knowledge

Re-Brandiry Project

Bangkok and Province

re-brandiry-project-01

 

  • Project Description               
:         PTTRM  Petro-Service stations located on various locations.
  • Client 
: PTT Retail Management Co.,Ltd.
  • Consultancy Services
:

Detailed architectural and engineering design and construction management work of following facilities:-

PTTRM Gas station Project include
-    Control Improve of High Way Sign   from  JET image  to PTT image.
-    Control Improve Canopy Fascia and  Canopy Column  from JET image  to PTT image.
-    Control Improve MPD from JET from to PTT form.
-    Control the installation Jiffy Sign and  Co-Brand Sign.
-    Control the construction and installation Price Sign from JET form to PTT form.
-    Control change arrow sign  from JET form to PTT form.

Group 1
-    BKK Ramintra 1
-    BKK Ramintra 2
-    Ayutthaya wangnoi (km.57)
-    Ayutthaya Asia Hi-way (km.51)
-    Chachoengsao-Bangna Trad (km.37)    
-    Chonburi Phanat Nikom 2
-    Phathum Thani – Phaholyathin km.30 (Zeer)    
-    Samut Prakarn-Bangna Trad (KM. 27)
 
Group 2
 
-    Ayutthaya Asia Hi-way (km.98)
-    BKK-Sukaphiban 1
-    Chachoengsao-Bangpai
-    Chachoengsao-Bangkla
-    Chonburi – Pattaya (Jomthien)
-    Chonburi – Phanat Nikom
-    Phathum Thani-Bangpoon 2 (KM.17)
-    Singburi – Inburi (KM.156)

Group 3
-    BKK-Sukaphiban 3
-    Chachoengsao-Bangprakong 3
-    Chonburi – Bangpra
-    Chonburi – Ban Bung 2
-    Chonburi – Bypass 4
-    Chonburi – Siracha (Laem Cha Bang)
-    Chonburi – Soracha (Ao Udom)
-    Nonthaburi-Tiwanon
-    Nonthaburi-Outer Ring Road KM 40 (Carrefour)
-    Phathum Thani Pinehurst

Group 4
-    Ayutthaya Asia Hi-way (km.89)
-    Chonburi – Ban Bung 3
-    Saraburi Hin Kong
-    BKK-Sukaphiban 1
-    BKK Suwintawong
-    Chachoengsao-Bangna Trad (KM.49)
-    Chonburi – Pattaya (Minisiam)
-    Lopburi-Tasala
-    Lobburi-Nikom
-    Nonthaburi-Rattanatibet 1
-    Phathum Thani Lumlukka 3
-    BKK Srinakarin (KM.18)
-    Saraburi-kangkoi 1

Group 5
-    BKK – Suwintawong
-    BKK – Vibhawadi Rangsit KM27
-    Chonburi – Rongpo
-    Chonburi – Nongmon
-    Saraburi-Pu Kae
-    BKK-Srinakarin KM.10
-    Chachoengsao-Bangprakong 2
-    Chonburi – Bypass 2
-    Chonburi – Bypass 2
-    Chonburi – Bypass 3
-    Lopburi – Thalechupsorn
-    Phathum Thani Lumlukka
-    Rayong – Sukumvit 2

Group 6
-    Chonburi – Pattaya
-    Chonburi – Bang Saen (Makro)
-    Rayong – Sukumvit 4
-    BKK-Ramintra KM.14
-    Chachoengsao-Bangprakong 1
-    Chachoengsao-Bangna Trad KM.41
-    Chonburi – Ban Bung 1
-    Chonburi – By pass
-    Chonburi – Bang sri
-    Phathum Thani Nuanchawee
-    Phathum Thani Rangsit (Klong 7)
-    Phathum Thani Lumlukka 2
-    Rayong Sukumvit 3

Group 7
-    Chonburi – Bang Saen (Lamsara)
-    Chonburi – Siracha (Laem Thong)
-    Nonthaburi-Bangyai 1
-    Nonthaburi-Bangbuathong
-    Rayong Sukumvit 1
-    Rayong Klang

Group 8
-    Samut Prakarn – Taparak
-    Samut Prakarn – Kingkal
-    Samut Prakarn – Bangna Trad KM.25

Group 9

-    Ayutthaya Asia Hi-way (km.55)

  • Construction Cost
: » 170 million baht per project
  • Status
: Completed

 


 

Images Gallery

{gallery}re-brandiry-project{/gallery}