Choose Language  :
            เลือกภาษา  :

Main Menu

เมนูหลัก

Knowledge

Micro-Electronic Manufacturing Plant

Micro-Electronic-01

 

  • Project Description               
:         SMT One is the first phase of Micro-electronics Facility being built in an Advanced Technology Industrial Park in Thailand.  The FAB Building contains a 50,000 ft.2  cleanroom in a ballroom configuration.  The gross area of the facility’s components is approximately 600,000 ft.2  All facilities are mostly constructed with a concrete frame structure.  The exception is the central portion of the FAB Building which is a long span steel truss system over the cleanroom.
  • Client 
: Sub-Micron Technology Public Co., Ltd., Chachoengsao,     Thailand.
  • Consultancy Services Provided
: Detailed architectural and engineering design for the whole project except for M/E design for FAB Building and construction inspection.
  • Construction Cost
: ≈1300 Million Bath
  • Associated Firm
:
Anderson DeBartolo Pan (ADP) of USA and Act Consultant Co.,Ltd. (Conceptual design and M/E detailed design for FAB Building).
  • Status
: Construction completed in June 1997

 


 

Images Gallery

{gallery}micro-electronic-manufacturing-plant{/gallery}