Choose Language  :

Main Menu

Knowledge

Automatic Accessories And Parts Processing Plant

automatic-accessories-and-parts-processing-plant-01

 

  • Project Description               
:         Project being built on land plot S-22 in Eastern Seaboard Industrial Estate, Tambol Pluak Daeng, Amphur Pluak Daeng, Rayong Province, Thailnad.  The project consists of the followings :
-    Process Building        (25,000 square metre);
-    Office Building          (1,500 square metre);
-    Chemicals Room               (96 square metre);    
-    High Tension Switch Room      (40 square metre);
-    Water Storage Tank         (190 square metre);
-    Guard House                 (9 square metre);
  • Client 
: Sekurit Saint-Gobain TOA Co., Ltd., Amphur Pluak Daeng, Rayong Thailand
  • Consultancy Services Provided
: Detailed architectural and engineering design.
  • Construction Cost
: ≈170 Million Bath
  • Associated Firm
:
Act Consultant Co.,Ltd. (architect and structural design)
  • Status
: Construction completed in April 1998.

 


 

Images Gallery

 

 

Share